Overview
Thirty four lot residential subdivision development, located off Allambie lane, Upper Ross River, stage one of three.
SUMMARY OF WORKS
Earthworks
- 10,000m3 of Imported Material
- Three hectares of 34 Residential Lots ranging from 600m2 to 800m2
Road Works
- 5,500m2 of roadway constructed
- 300m of box culverts
Civil Infrastructure
- Sewer and water main installations
- Large stormwater box culvert system put in place for current and future stages.








