Overview 

Thirty four lot residential subdivision development, located off Allambie lane, Upper Ross River, stage one of three.

SUMMARY OF WORKS

Earthworks

  • 10,000m3 of Imported Material
  • Three hectares of 34 Residential Lots ranging from 600m2 to 800m2 

Road Works

  • 5,500m2 of roadway constructed
  • 300m of box culverts

Civil Infrastructure

  • Sewer and water main installations
  • Large stormwater box culvert system put in place for current and future stages.