Project:

Client

Value:

Expected Completion:

CURRENT PROJECTS


Stages 3-6 include: Concrete Roadworks & Drainage (13,770m2 equaling 24,780m3 concrete pavements, 1.8km of drainage pipes); Sewer Reticulation (3km of sewer pipes); Water Reticulation (3.3km of water pipes).

Prior to this, Mendi was awarded the initial bulk earthworks component of this project, and was successful in being further awarded Stages 1-2.




Project:

Client

Value:

Expected Completion:

Located on a 16.5Ha site at the Northern Beaches of Townsville Mendi were engaged to undertake the Civil Infrastructure works for the new Northern Beaches Retirement Village.  To prepare the site for earthworks, 3 dwellings were required to be demolished and all materials removed from site.

  • Earthworks required 43,895m3 of cut to fill on site. 

  • Roadworks consisted of concrete pavements totalling 6,830m2 (11,952m3).

  • 1.6km of stormwater drainage pipes.

  • 2.6km of water pipes. 

  • 1.6km of sewer pipes.

Project:

Client

Value:

Expected Completion:


Northern Beaches Lifestyle Estate - Stage 1

The Trustee for Summer Lp Sanctum Prop Trust

$9.7M

July 2026

Gemlife Retirement Village - Civil Works: Stage 1-2

C/- Westera Partners

$8.3M

July 2026

The first stages of construction of a $210 million over-50s development in the Harris Crossing Estate, by developer Living Gems.
Mendi was awarded the initial bulk earthworks component of the project involving the import of general fill (CBR 3 min -200mm screened) 156,162t. ​
Works moved on to include the Civil Infrastructure component for Stages 1 & 2. This includes:

  • ​Concrete Roadworks & Drainage (9,964m2 equaling 17,000m3 concrete pavements, 1km of drainage pipes)

  • Sewer Reticulation (1.2km of sewer pipes)

  • Water Reticulation (2.7km of water pipes)

  • External Sewer & Sewer Works (connect to existing)

PAST PROJECTS

Cosgrove Estate - Stages 601, 602 & Bulk Earthworks

Parkside Developments Pty Ltd

$16.7M

November 2026

Project:

Client

Value:

Expected Completion:

Gemlife Retirement Village - Civil Works: Stage 3-6

TC/- Westera Partners

$11.6M

November 2026

Diversion Channel: Topsoil strip and cut 4,600m3 including a final layer of 16,540m2.

HES Basin & Dirty Water Drain: Excavation of 16,430m3. Lime treatment of basin floor and wall area. Rock protection of varying thickness. Stormwater drainage with 1,200mm dia manhole with decants and frames. Permeable baffle fences and fate. Raise current sewer manhole, relocate current leachate pipe, relocate compressed air pipe.

Construction of Access Road and Ramps to Pond.

Installation of Turbid dosing system including electrical works.

The works consist of the construction of earthworks, roadworks, stormwater drainage, water reticulation, sewer reticulation and electrical and telecommunications ducting for the new 151 allotments.

Part of the work area is rock which required controlled blasting, Mendi was to manage the blasting crew. The blast material was to be crushed on site to 75mm minus and carted to future stages in Precinct 5.

Project:

Client

Value:

Expected Completion:



Stuart Landfill - Cells 4 & 5 Construction

Townsville City Council

$10.1M

November 2026

Stuart Landfill - Sediment Pond 3 & Diversion Channel

Townsville City Council

$3.3M

November 2026

5Ha of clearing and grubbing to then excavate 33,202m3 of trim and compact cell floor. Construction of a groundwater depressurisation system using MEG300 panel strips.

Installation of geosynthetic lining components.

Installation of a Leachate Collection Pipework Network, drainage aggregate layer, separation geotextile layer, temporary UV protection layer and connection to the existing Cell 2.

Works also involved the construction of a sealed Access Road to the new Cells from the Transfer Station.

Project:

Client

Value:

Expected Completion:

Project:

Client

Value:

Expected Completion:


Bayswater Road Extension & Watermain

Parkside Development Pty Ltd

$7.1M

December 2026

Extension to Bayswater Road to facilitate servicing of Precinct 6 within the Cosgrove Estate development.

Works comprise construction of a roundabout, signalised intersection, and trunk watermain.